Crushed Stone Calculator

Enter the size of the area and a depth and get the crushed stone to order in tons or cubic yards, at a weight you can see and change, rounded up once to the supplier's step.

A ready-made setup of the Gravel Calculator.

Estimates for planning, not professional advice. Read the full notice.

Area size

Feet and inches, like 12' 6"

reads as 12 feet

Feet and inches, like 12' 6"

reads as 12 feet

Inches, like 4 in

reads as 4 inches

Example: a crushed stone area

3 tons to order (2.7 tons exact)

  • Volume in the area 48 ft³
  • Cubic yards to order 1.78 yd³
  • Cubic yards at the supplier's step 2 yd³
  • Tons at the weight above 2.7 tons
  • Tons at the supplier's step 3 tons

Shopping list

Example: a crushed stone area
ItemSizeBuy
Crushed stone by the ton1 ton3 tons

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Worked example: a crushed stone area

    Show the working
    1. Area 12 ft × 12 ft = 144 ft²
    2. Volume at the depth 144 ft² × 4 in = 48 ft³
    3. Add the waste allowance, once 48 ft³ + 0 % waste = 48 ft³
    4. Cubic yards: divide by the cubic feet in a yard 48 ft³ ÷ 27 ft³ in a yd³ = 1.78 yd³
    5. Tons: multiply by the weight of a cubic yard 1.777778 yd³ × 1.5 ton/yd³ = 2.7 tons
    6. Round up once, to the supplier's ton step 2.7 tons = 3 tons

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Gravel, crushed stone or No. 57 stone weight 1.5 ton/yd³[1][2]
    Default Penn State's calculator uses 1.50 tons per loose yard for AASHTO 57. Sources differ, so the other figures are named as options.
    Landscape waste or overage 0%
    Default No silent overage. Check your label or supplier.
    Supplier's smallest yard step 0.5 yd³
    Default Suppliers sell bulk in steps. Check your label or supplier.
    Supplier's smallest ton step 1 ton
    Default Suppliers sell by the ton in steps. Check your label or supplier.

    Crushed stone in tons by area and depth

    Tons of crushed stone for three area sizes at three depths, at the weight in the assumptions, before any step

    Tons of crushed stone for three area sizes at three depths, at the weight in the assumptions, before any step
    Area2 in deep4 in deep6 in deep
    10 ft × 10 ft 0.93 ton1.85 ton2.78 ton
    12 ft × 12 ft 1.33 ton2.67 ton4 ton
    20 ft × 20 ft 3.7 ton7.41 ton11.11 ton

    Each cell is the exact weight at the starting weight, so a ton step rounds it up once at order time.

    Weights from the sources

    Weight of a cubic yard of gravel or crushed stone as each source gives it

    Weight of a cubic yard of gravel or crushed stone as each source gives it
    Source and caseWeight per cubic yard
    Penn State, AASHTO 57 stone, loose, as shipped 1.5 ton/yd³
    Ohio DOT, gravel size 57, loose 2,500 lb/yd³
    Ohio DOT, limestone size 57, loose 2,400 lb/yd³
    MoDOT, granite or limestone, loose: from 2,410 lb/yd³
    MoDOT, granite or limestone, loose: to 2,590 lb/yd³
    New Mexico EMNRD, gravel from a quarter inch to two inches (the source does not say loose or compacted) 1.42 ton/yd³
    Caltrans, loose 1.5 ton/yd³

    Sources: [1][2][3][4][5][6]

    The calculator starts from the Penn State figure. The sources differ, and one of them says nothing about loose or compacted, so each row names its own wording. The Caltrans compacted figure is left out because an order is for loose material.

    Questions

    How far does a ton of crushed stone go?

    The tons grid gives the weight for three areas and three depths; divide your own area and depth the same way, or enter them above and read the tons.

    Is 57 stone the same as three-quarter inch crushed stone?

    Suppliers use both names for their own products, and the calculator takes your supplier's weight rather than a name. The weights table lists what each source gives, and the number in the assumptions is yours to change.

    Sources (6)

    1. DGLVR Materials Calculator, data file road-aggregate-fill-materials.xml (opens in new tab), Penn State Center for Dirt and Gravel Road Studies, data entry dated Monday, March 20, 2017 (value is in the calculator's data file, not in prose). Code or government.
      “Transcribed from the entry AASHTO 57 (PennDOT 2B) of the calculator's data file: 1.50 tons per cubic yard.”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 1)
    2. DGLVR Materials Calculator (opens in new tab), Penn State Center for Dirt and Gravel Road Studies, web page (page text, undated; calculator data dated March 20, 2017). Code or government.
      “the estimates generated will always appear as cubic yards of loose material and US tons as-shipped (loose) ... The volume to weight conversion factors used for the calculator are averages from across PA, based on observations by Center field staff.”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 2)
    3. Construction and Material Specifications, Item 410.06, Table 410.06-1 (opens in new tab), Ohio Department of Transportation, 2023 C&MS (January 1, 2023; online version 07/17/2026); the PDF prints the cubed unit as a replacement glyph, restored here as yd3. Code or government.
      “The Department will measure the cubic yards of aggregate used loose in the vehicle at the point of delivery or calculate it by converting from weight using the following conversion factors: ... Gravel, Size No. 4 and 57 2500 lb/yd3 ... Limestone, Size No. 4 and 57 2400 lb/yd3”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 3)
    4. Highway Maintenance Tables and Conversion Factors, Compacted and Loose Weights of Various Materials (opens in new tab), Missouri Department of Transportation (Engineering Policy Guide attachment; the table is a Michigan LTAP table hosted by MoDOT), file modified December 12, 2024; PDF p. 5, a rotated page; the loose rows were read from the PDF text with glyph positions (HC1, November 12, 2026). Code or government.
      “LOOSE WEIGHTS OF VARIOUS MATERIALS ... Granite or Limestone 89 2,410 67 ... 93 2,500 69 ... 96 2,590 72 ... Sand 97 2,630 73 ... 110 2,960 82”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 4)
    5. Conversion Factors for Construction Materials and Common Minerals (opens in new tab), New Mexico Energy, Minerals and Natural Resources Department, Mining and Minerals Division, undated one-page table, adapted from BLM H-3890-1 Handbook for Mineral Examiners. Code or government.
      “To convert cubic yards to short tons, multiply the commodity production cubic yardage by the conversion factors listed below. ... Base course 1.25 ... Fill Dirt 0.8 ... Gravel ¼" – 2" 1.42 ... Sand 1.45 ... Top Soil 0.8”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 5)
    6. Maintenance Manual Volume One, Appendix, Section 20 Aggregate per Mile (opens in new tab), California Department of Transportation, July 2014. Code or government.
      “Quantities based on-- 1.5 tons = 1 cu. yd. ... Loose tons = 1.5 X actual yardage. Compact tons = 2.0 X actual yardage.”
      Checked November 12, 2026. Figures and codes change; verify with the source. Back to where this is used (Source 6)

    These are summaries of what the sources say, not professional advice. Codes and product data change. Check with your building department and the product label about your own project.